STAGE 1
Retrofit Projects provided a full retrofit survey including a thermal imaging report and detailed insulation specification.
Following the survey
Works organised by our project management team and approved contractors.
STAGE 2
The existing loft area was cleaned and all rubbish and debris removed.
STAGE 3
A new robust quality timber loft ladder was fitted.
STAGE 4
The existing loft boarding was removed, and new loft insulation was laid to a depth of 270-300mm.
STAGE 5
A new boarded storage area was created by increasing the height of the ceiling joists to allow for thicker insulation.
STAGE 6
Additional shelving was provided for more storage, and the timber truss structure strengthened.
STAGE 7
The cavity walls will be insulated using the EPS bonded bead system, under the GBIS grant funded scheme.
The work organised by Retrofit projects will improve the EPC rating.
The work was completed in February 2025.
Further work is planned for spring 2025.
All work undertaken is covered by a full guarantee on both labour and materials.