STAGE 1
Retrofit Projects provided a full retrofit survey, including a thermal imaging report, damp report and a wall tie report and specification.
Following the survey
Works organised by our project management team, and approved contractors.
STAGE 2
The existing cavity wall blown fibre insulation was removed, and a full cavity cleaning process was undertaken to clear out debris at the base of the walls.
STAGE 3
The existing wall ties were removed, and new stainless-steel ties were inserted, the damaged and cracked render was removed.
STAGE 4
Following cavity cleaning and installing new wall ties, the property was insulated using the EPS bonded bead system. The loft space was also insulated.
STAGE 5
The existing PVCu windows were replaced with new A-rated windows frames and a new front door.
STAGE 6
The property was finished externally using an approved and guaranteed specialist rendering system, maintaining the character of the home.
The work was completed in Autum 2024.
Further work is planned for spring 2025 to complete the exterior painting and some roof repairs.
All work undertaken is covered by a full guarantee on both labour and materials.