Stage 1
Retrofit Projects provided a full retrofit survey, including a thermal imaging report, and a re-pointing specification for the front and rear elevation.
Stage 2
The property was suitable for a small solar PV system on the rear roof elevation, with a battery storage system fitted externally.
Stage 3
The front and rear walls were repointed to take advantage of the scaffolding.
Other remedial work was carried out while scaffolding was provided to ensure the roof was sound and any repairs were easily dealt with.
Stage 4
The client wanted to replace the existing older glazing with new A-rated frames.
A-RATED, Flush casement PVCu windows were recommended.
Stage 5
Although adding internal wall insulation was not an option in this home, the loft space and insulation was upgraded and fully boarded with a new loft ladder.
The work was completed in spring 2025.