Stage 1
Retrofit Projects provided a full retrofit survey, including a thermal imaging report, and a specification for re-pointing the front, side, and rear elevation.
Stage 2
To solve the damp issue, the base of the cavity walls were cleaned and rubble removed from the cavity, in addition a gravel soak-away was formed to the perimeter of the property, this solved the damp problem.
Stage 3
The front and rear walls were repointed by a specialist contractor.
Further remedial work was carried out while scaffolding was provided to ensure the roof was sound and any repairs were easily dealt with.
Stage 4
The client wanted to replace the existing older glazing with new A-rated frames.
Further recommendations, and work planned for spring 2025.
Stage 5
Under-floor insulation to the ground floors.
Stage 6
Insulation to be fitted to the sloping ceilings to the first-floor bedrooms.
Stage 7
The client is planning a new single storey extension to the rear elevation.
The work was completed in spring 2024 and further work planned for spring / summer 2025.